for line 13 and line 16 phase of 2 stations at the end of the train, officially launched on-line debugging. To ensure that opened at the end, will conduct a comprehensive debugging on car body. Although Cheap Tigers Jerseys the 2 new distance is not long, only opened 5 stations, but will access a plurality of transfer station.
reporter yesterday to see, a row with 13 lines train line commissioning engineer at Longde Road station, Longde Road station, Changshou Road station section of train line debugging starts. East Longde road phase will be opened by the Cheap Expos jerseys end of 13 lines Cheap Pirates jerseys station, Wuning Road station, Changshou Road station 3 stations started internal decoration, will soon debut. According to the introduction, this section of rail line opened at the end, 13 lines are really into the inner city, Cheap St.Louis Browns Jerseys and increase the transfer and line 7 (Changshou Cheap Phillies jerseys Road station), transfer and line 11 (Longde Road Station) two transfer point.
another development, before the end of the year with the opening of the three stations, a line on the West 13 River Road station will be opened simultaneously.
on the same day, a line 16 train heading to Longyang Road station from the Luo Shan Road station, began to on-line debugging. The official opening, terminal 16 line into Longyang Road station, and from the Luo Shan Road station to Longyang Road with 2 new stations, running for 9 minutes. Then, line 16 transfer rail line from the current line 11, increased to 4 (including the magnetic levitation), greatly improving the lines and network integration.
没有评论:
发表评论