2014年9月1日星期一

attention. At the same time

people.com.cn Hainan windows on Haikou on 19 August, (Feng Xing) recently, the network reported "Haikou sea area residents turned mayor: payment for 21 years without gas" caused by the relevant departments of Haikou City, attention. At the same time, Hainan Minsheng gas pipeline limited company responsible person in November can be completed shipping district project construction and ventilation.

for sea area residents to write "open letter" expressed the hope that relevant departments to compensate for the losses and explain why 21 years can not use gas pipeline problems, Hainan Minsheng gas pipeline limited company responsible person pointed out, gas development fees district residents 21 years ago to pay is the project was built, according to the stipulation to the City Hall, not to the Gas Co, but have to pay gas development fees indoor facilities have not yet installed user, need to apply and confirm the Gas Co has the installation conditions, the Gas Co based on the provincial Price Bureau documents for the installation procedures.

The

"sea area in 2009 for the first time to Hainan Minsheng Gas Pipeline Co. proposed to install the application, when, in order to solve the problem of installation and ventilation of the area, Hainan Minsheng Gas Pipeline Co. had to Haikou City Planning Bureau for the gas pipe, Haikou City Planning Bureau to the Division I reply: Du Road, Harbour Road (Xingang Road), Baohua road three state road of Xingang reclamation area, the area control regulation is revising, the suspension of gas pipe position. Another solution because of the need to take over from the area next to the market road and across markets because they do not meet the safety requirements and can not be implemented." The responsible person said. cheap Beanies

for sea area use gas, Hainan Minsheng Gas Pipeline Company Limited relevant responsible person responded: "after the Gas Co technical personnel on-site inspection found near the market, the original shipping area in April this year has been relocated (but not inform our Gas Co), so according to the actual situation, plan to declare in the market the existing gas cheap new era hats pipeline through road touch the mouth connected and into marine cell to the Municipal City Management Committee, in order to solve the problem of construction and ventilation in the area of the whole project, the project construction period of about 3 months, in November is expected to be completed and ventilation. Therefore, the gas main pipe not to consider the implementation of the road from Xingang to."

in addition, technical review of the Municipal Planning Department of Haikou City Planning Bureau responsible person said, although the district residents pay gas development fee is not used after the long-standing problem of gas, but 09 years ago the city planning board on the matter did not cheap NFL Hats know, 2009 Minsheng Gas Co to the City Planning Bureau for the Harbour Road cheap MLB Fitted Hats (Xingang Road) requirements for the design of gas pipeline, at that time Xingang area due to gauge local adjustment control of the city planning bureau is the heart of the city of Haikou Binhai District, so return to Minsheng Gas Co suspended Harbour Road and cheap hats other roads gas pipe position.

没有评论:

发表评论